Moving Right Along!

Tuesday, June 15, 2010

The workers have been hard at work on our house! We now have shingles on [almost all of] our roof. All of our windows and rear doors are installed. The framing around all of our windows has been completed (not pictured). The interior stairs have been installed, so we are now able to check out our upstairs! We were able to go to the basement through our walk up in the back of the house, but now we can run up and down all the stairs inside!

This week, they should be installing all of our duct work inside, along with our furnace. We're at a point where the things they are working on aren't quite as exciting to share (but still exciting to us!) and we have to look a little harder to scope out the progress. We just scheduled our pre-drywall walk through for June 28. So exciting!